Fleet of transit mixer trucks lined up in a concrete plant yard at golden hour with industrial plant rising behind them
BATCH PLANT ONLINE — 05:00:00

THE DRUM IS
LOADED
AND ROLLING.

30-ton mixers through predawn darkness. DOT-grade mix designs for bridge decks, footings, and slabs — delivered before the crew hits site.

24
Transit Mixers
3
Batch Plants
2.1M+
Cubic Yards Poured
0.0%
Reject Rate, 2025
PLANT STATUS — LIVE
DRUMS LOADED
24ACTIVE
LIVE
NEXT DISPATCH
04:45AM CST
LIVE
LEAD TIME TODAY
2–4HRS
YARDS AVAILABLE
1,440CY
TODAY'S MIX AVAILABILITY
MIXSLUMPQTY
3000 PSI4"480 CY
4000 PSI4"360 CY
5000 PSI3"240 CY
FIBER-REINF5"200 CY
FLOWABLE FILLN/A160 CY
REV. FEB 2026

Every Mix. Every Spec.
Right Here.

All mixes batched to ASTM C94 and ACI 301. DOT-approved designs available with certified delivery tickets on every load.

MX-3000
3,000 PSI
$148–$162/CY
Residential Slabs / Sidewalks
SLUMP
3"–5"
AIR
5–7%
AGG
¾"
W/C
0.58
MX-4000
4,000 PSI
$155–$172/CY
Footings / Foundation Walls
SLUMP
3"–5"
AIR
5–7%
AGG
¾"
W/C
0.50
MX-4000F
4,000 PSI
$168–$185/CY
Fiber-Reinforced Structural Slab
SLUMP
4"–6"
AIR
4–6%
AGG
¾"
W/C
0.50
MX-5000
5,000 PSI
$182–$204/CY
Bridge Decks / DOT Infrastructure
SLUMP
2"–4"
AIR
6–8%
AGG
½"
W/C
0.40
MX-5000HE
5,000 HE PSI
$196–$218/CY
High-Early Strength / Fast-Track
SLUMP
3"–5"
AIR
5–7%
AGG
¾"
W/C
0.38
MX-FF
FLOWABLE PSI
$118–$134/CY
Controlled Low-Strength / Backfill
SLUMP
FLOW
AIR
3–5%
AGG
⅜"
W/C
N/A

* All prices FOB plant. Delivery surcharge applies beyond 15-mile radius. Mix designs subject to project QC requirements.

Download Full Spec Sheet →

3 Plants.
Every Zip Code Covered.

Overlapping drive-time radii mean zero gaps in coverage. No job site is beyond reach — cul-de-sac or bridge deck.

NORTHEASTERN ILLINOIS — DRIVE-TIME RADII
P1 / NORTH PLANTP2 / CENTRAL PLANTP3 / SOUTH PLANT~10 MI
DRIVE-TIME LEGEND
30 MIN RADIUS~8–12 MI
60 MIN RADIUS~18–24 MI
90 MIN RADIUS~28–36 MI
P1NORTH PLANT
Northbrook, IL
FLEET SIZE
10 TRUCKS
DAILY CAP.
600 CY/day
30-MIN ZONE
~10 MI RADIUS
STATUS
OPERATIONAL
Check Availability for My Zip →
FY2024–2025

Proof in the Data.
Not the Brochure.

Every number below came off a certified delivery ticket. Pour volume, placement rate, trucks dispatched — all verified.

7,660CY
Total Volume — Featured Projects
766LOADS
Total Dispatches
0.0%
Combined Reject Rate
4PROJECTS
On-Time Delivery, All Pours
CS-001MUNICIPAL / DOT

Route 83 Bridge Deck Replacement

IDOT — District 1Lake County, IL

2025
Pour Volume
1,840CY
Placement Rate
62CY/HR
Trucks Dispatched
184LOADS
Reject Rate
0.0%
MIX:5,000 PSI DOT — 6% AIR

Continuous 29-hour pour. Zero cold joints. On-time ticket delivery within ±4 min of schedule.

CS-002COMMERCIAL / MULTI-PHASE

Westfield Commerce Park — Phase II

Meridian General ContractingSchaumburg, IL

2025
Pour Volume
4,200CY
Placement Rate
48CY/HR
Trucks Dispatched
420LOADS
Reject Rate
0.0%
MIX:4,000 PSI FIBER — 5% AIR

14-week phased delivery schedule. 6 AM start times maintained across all 22 pours.

CS-003RESIDENTIAL / SUBDIVISION

Ridgecrest Residential — 47-Lot Subdivision

Parkway Homes DevelopmentPlainfield, IL

2024
Pour Volume
940CY
Placement Rate
28CY/HR
Trucks Dispatched
94LOADS
Reject Rate
0.0%
MIX:4,000 PSI — ¾" AGG

Cul-de-sac delivery to 47 individual lots. No staging area. Single-truck access on all sites.

CS-004AVIATION / UTILITY

O'Hare Terminal Utility Trench Backfill

Walsh Construction GroupChicago, IL

2024
Pour Volume
680CY
Placement Rate
85CY/HR
Trucks Dispatched
68LOADS
Reject Rate
0.0%
MIX:FLOWABLE FILL — CLSM

FAA-restricted delivery windows. All 68 loads dispatched and placed within a 4-hour airside access window.

Ready to Pour?

Tell us what you're building. We'll respond with a firm price and available dispatch window within 2 business hours.

POUR QUOTE REQUEST FORM — BATCH CONCRETE

Minimum order: 1 CY. Full truck load = 8–10 CY.

No commitment required. Firm pricing, available dispatch window, certified delivery tickets on every load.